PROJECT CASE STUDY

·

#631210

Glycol Removal and Water Flush on Closed Cooling Water System

FINAL

Glycol Concentration: Approximately 1%

SNAPSHOT

ASSET(S)

Closed Cooling Water System

YEAR

2026

OBJECTIVE

Reduce glycol concentration in the closed cooling water system so the customer can refill and operate it with water only.

WHAT WE FOUND

Glycol and water remained at 16 underground low points after the main drain-down. Glycol crystallization required a second rinse to bring it back into solution.

HOW WE DID IT

PROCESS

  1. Stage equipment, confirm tie-in points, and review site safety requirements.

  2. Drain glycol from the system and its 16 underground low points.

  3. Flush with clean water to dilute and remove remaining glycol.

  4. Complete a second rinse to address crystallization.

  5. Sample the low points with a refractometer and turn the system over for customer refill.

TECHNICAL DETAILS

VERIFICATION METHOD

Low-Point Sampling with a Temperature-Compensated Glycol Refractometer

FLUID

Glycol and Water Mixture

FLUID VOLUME

41,090 Gallons Recovered

RELEVANT SPECIFICATIONS

16 underground low points, approximately 9 feet deep. Two water rinses were completed.

THE NUMBERS

Glycol Concentration

Approximately 10%

→

Approximately 1%

SAFETY

100% Safety Performance

Every Step. Every Reading.

This page is the short version. The full report walks through every step we took, how we verified it, and what the numbers came back at. Customer details are redacted. The data isn’t.

Download Full Technical Report

MORE WORK FROM THE FIELD

ISO Particle Count: 14/11/7

Chemical Clean and Oil Flush on Two Boiler Feedwater Pump Lube Oil Systems

Main NAS Rating: NAS 5

Chemical Clean and Oil Flush on Main and Auxiliary Hydraulic Power Units

ISO Particle Count: 14/12/8

Chemical Clean and Oil Flush on Steam Turbine Generator Lube and Seal Oil Systems