PROJECT CASE STUDY
·
#631265
Chemical Clean and Oil Flush on Main and Auxiliary Hydraulic Power Units
FINAL
Main NAS Rating: NAS 5
SNAPSHOT
ASSET(S)
Main and Auxiliary Hydraulic Power Units
YEAR
2026
OBJECTIVE
WHAT WE FOUND
HOW WE DID IT
PROCESS
Identify system tie-ins, coordinate with the site, and stage equipment.
Chemically clean the main system with FF2020 and verify cleanliness before moving to the auxiliary system.
Repeat chemical cleaning and verification on the auxiliary system.
Drain the cleaning fluid and refill with customer operating oil for the flush.
Perform a high-velocity oil flush on both systems and verify final screens and particle counts for turnover.
TECHNICAL DETAILS
VERIFICATION METHOD
ISO 4406 Particle Counting and API 614 Screening Observations
FLUID
FF2020 Cleaning Fluid and Customer Operating Oil
RELEVANT SPECIFICATIONS
Final ISO counts: 16/15/10 (main) and 14/12/11 (auxiliary). The systems were cleaned separately. Main-system piping included 1-inch and 3-inch lines. Reservoir decontamination and final fill were outside the executed scope.
THE NUMBERS
Main NAS Rating
Not Reported
→
NAS 5
TARGET:
NAS 7–8
Auxiliary NAS Rating
Not Reported
→
NAS 3
TARGET:
NAS 7–8
SAFETY
100% Safety Performance
Every Step. Every Reading.
This page is the short version. The full report walks through every step we took, how we verified it, and what the numbers came back at. Customer details are redacted. The data isn’t.
Download Full Technical Report
MORE WORK FROM THE FIELD
ISO Particle Count: 14/11/7
Chemical Clean and Oil Flush on Two Boiler Feedwater Pump Lube Oil Systems
ISO Particle Count: 14/12/8
Chemical Clean and Oil Flush on Steam Turbine Generator Lube and Seal Oil Systems
System 1 On-Site ISO Count: 12/8/0