Granbury Texas Reservoir Decontamination and Fluid Purification
Overview
Frontline Global Services successfully executed a reservoir decontamination and existing fluid purification on the GE 7EA Turbine Generator Lubrication System at a power plant in Granbury, TX. The project involved cleaning and decontaminating the system, and filter filling with existing system operational oil. Slip-stream purification was performed to meet and maintain the target ISO Cleanliness Code of 16/14/11 or better. The project was completed safely, efficiently, and within the scheduled 1.5-day window.
Project Objectives
Safety and Efficiency
Efficiently minimize equipment downtime while ensuring all operations are conducted safely, protecting personnel and equipment.
Purify Existing System Fluids
Ensure that any remaining fluids meet OEM cleanliness specifications.
Cleanliness Standards
Achieve a final particle count of 16/14/11 or better, per industry standards (API 614), and ensure clean screens free of particulates.
Methodology
The project was carried out through a fully engineered turnkey approach. Pre-project planning included multiple site visits, coordination with HS&E personnel, system tagging, and project walkthroughs. On execution, reservoir decontamination, and a controlled refill were conducted. The system was brought to operating conditions and purified via slipstream filtration until ISO code 16/14/11 was stably achieved.
Process
Reservoir Decontamination (Initial): Initial cleaning and flushing of the reservoir to remove major contaminants and construction debris.
Reservoir Decontamination (Final): Secondary flushing and inspection to ensure the reservoir meets required cleanliness specifications.
Fluid Purification Process: Circulate and filter existing or newly added fluids to ensure they meet ISO 16/14/11 or better.
Final Fluid Fill: System re-inventoried with filtered existing operational oil meeting OEM standards.
Project Summary
Efficient & Safe
Timely execution, proven methodology, and delivery of a thoroughly cleaned and tested system satisfied our customer’s operational and cleanliness standards, all done in a safe and fast manner.
Increased Equipment Reliability
By removing built-up contaminants, the assets are now better positioned to operate at optimum efficiency and reduce the risk of downstream issues.
Clean Screens & Particle Counts
Clean Screens & Particle Counts
Conclusion
Frontline Global Services successfully executed the maintenance process on the CT1 - GE 7EA Turbine Generator Unit. Despite external challenges such as lightning delays and confined space limitations, all objectives were met or exceeded. The project serves as a testament to Frontline’s turnkey, results-oriented execution model and commitment to safety and quality.